Laserfiche WebLink
L 4 <br /> 08 December 2004 <br /> AGE-NC Project No 99-0657 <br /> Page 4 of 7 <br /> 6.0. ON-SITE WORK PLANS <br /> i <br /> Work party(ies) consisting of two persons will perform the following tasks <br /> PROJECT TEAM LEADER: TASK: <br /> Daniel W Kalmbach Collect soil, direct drilling <br /> FIELD CREW: TASK: <br /> Driller Advance borings/ install wells <br /> Field Technician (if nec ) Clean equipment <br /> The works party(ies) shall be briefed on the content of this plan prior to initiating onsite work <br /> 7.0. COMMUNICATION PROCEDURES <br /> If hearing is impaired, the following standard hand signals will be used <br /> Hand gripping throat Out of air, can not breath <br /> Grip partner's wrist or both hands around waist Leave area immediately <br /> Hands on top of head Need assistance <br /> Thumbs up OK, I am alright, I understand <br /> Thumbs down No, negative <br /> 8.0. EMERGENCY MEDICAL CARE <br /> Lodi Memorial Hospital located at 975 South Fairmont Avenue and is approximately 5 minutes <br /> from the site Route to the hospital: From the site, east on W Turner Road then south on N Davis <br /> Road then east on W Sargent Road follow as road changes to E Sargent road then follow as road <br /> changes to E Lodi Avenue then south on S Fairmont Avenue hospital is on the west side of Fairmont <br /> Avenue A map depicting the route to this facility is attached <br /> Local ambulance service is available at phone 911 Their response time is 5 to 10 minutes <br /> Advanced GeoEnvironmental,Inc <br />