Laserfiche WebLink
I TABLE OF CONTENTS <br /> • Pale <br />' 1.0. INTRODUCTION 1 <br />' 2.0. PROCEDURES 1 <br /> 2 1 MONITORING WELL INSTALLATION, DEVELOPMENT AND SURVEY 1 <br /> 2 1 1 Drilling and Sampling 1 <br /> I212 Logging 2 <br /> 2 1 3 Well Completions 2 <br /> I 2 1 4 Laboratory Analyses of Soil Samples 2 <br /> 2 1 5 Monitoring Well Development 3 <br /> 2 1 6 Well Head Survey 3 <br /> 21 7 Soil Disposal 3 <br /> 22 QUARTERLY WELL MONITORING PROCEDURES 3 <br /> 2 2 1 Well Monitoring and Evacuation 3 <br /> I2 2 2 Collection and Analysis of Ground Water Samples 4 <br /> 30, FINDINGS 4 <br /> 31 STRATIGRAPHY 4 <br /> 32 ANALYTICAL RESULTS OF SOIL SAMPLES 5 <br /> 33 GROUND WATER GRADIENT AND FLOW DIRECTION 5 <br /> 34 ANALYTICAL RESULTS OF GROUND WATER SAMPLES 6 <br /> 4.0. SUMMARY AND CONCLUSIONS 6 <br /> 5.0. RECOMMENDATIONS 7 <br /> 6.0. LIMITATIONS 7 <br /> I FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 - Site Plan Map <br /> Figure 3 - Ground Water Elevation Map <br /> Figure 4 -Approximate Distribution of Dissolved TPH-g <br /> Figure 5 -Approximate Distribution of Dissolved Benzene <br /> I Figure 6 -Approximate Distribution of Dissolved MTBE <br /> Figure 7 - Geological Cross Section A-A ' <br /> Figure 8 - Geological Cross Section B-B' <br /> ITABLES <br /> Table 1 - Ground Water Elevations <br /> I Table 2 -Analytical Results of Ground Water Samples <br /> Table 3 -Analytical Results of Soil Samples <br /> IAdvanced GeoEnvironmental,Inc <br /> f <br />