Laserfiche WebLink
I <br /> TABLE OF CONTENTS <br /> Paye <br />' 10. INTRODUCTION 1 <br />' 2.0. PROCEDURES 1 <br /> 2 1 WELL MONITORING AND EVACUATION 1 <br />' 2 2 COLLECTION AND ANALYSIS OF GROUND WATER SAMPLES 1 <br /> 3.0. FINDINGS 2 <br />' 3 1 GROUND WATER GRADIENT AND FLOW DIRECTION 2 <br /> 32 ANALYTICAL RESULTS OF GROUND WATER SAMPLES 3 <br />' 4.0. SUMMARY AND CONCLUSIONS 3 <br /> 5.0. RECOMMENDATIONS 4 <br />' 6.0. LIMITATIONS 4 <br /> FIGURES <br /> . Figure I -Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 - Ground Water Elevation Map <br /> Figure 4 -Approximate Distribution of Dissolved TPH-g <br /> Figure 5 -Approximate Distribution of Dissolved Benzene <br /> Figure 6 -Approximate Distribution of Dissolved MTBE <br /> TABLES <br />' Table 1 - Ground Water Elevations <br /> Table 2 -Analytical Results of Ground Water Samples <br /> Table 3 -Analytical Results of Grab Ground Water Samples <br /> APPENDICES <br /> Appendix A -Field Data Sheets <br /> Appendix B -Laboratory Reports <br />' Advanced CcoEnvironmental,Inc <br /> I <br />