Laserfiche WebLink
' 16 May 2002 <br /> • AGE-NC Project No 99-0657 <br />' Page 6 of 6 <br /> 5.0. RECOMMENDATIONS <br /> Based on the findings from this Investigation, AGE recommends, <br />' • Continued quarterly ground water monitoring at the site, <br /> • Installation of four shallow-screened ground water monitoring wells on-site, as outlined In <br /> the AGE-prepared Additional Site Assessment Work Plan, dated 08 August 2001, and <br /> • Preparation of a work plan to assess and define the lateral and vertical extent of Impacted <br /> ground water in hydrologic units HU3, HU5, and HU6 <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing In this or similar localities The findings were based mainly <br /> upon analytical results provided by an Independent laboratory Evaluations of the geologic/hydro- <br /> geologic conditions at the site for the purpose of this investigation are made from a limited number <br /> of available data points (CPT data and ground water samples), and subsurface conditions may vary <br /> away from these data points No other warranty,expressed or Implied,is made as to the professional <br /> Interpretations, opinions and recommendations contained In this report <br /> I <br /> I <br /> Advanced GeoEnve ron mental,Inc <br /> I <br />