The site is presently on a quarterly monitoring program and <br /> that will continue without change. Certain additional <br /> requirements of the Regional. Board related to the Waste <br /> Discharge Requirements may be added including the regular <br /> sampling of the carbon filtration system. <br /> During the first 1-3 months of system operation water <br /> levels, pumping rate and line pressures will be monitored <br /> frequently in order to assess the efficacy of the hydraulic <br /> control scheme. Adjustments to the recovery well pumping <br /> rate will be made as warranted by the field data. A log will <br /> be maintained recording all measurements <br /> of in system the <br /> parameters including the dissolved oxygen <br /> reinjected water. A totalizing flowmeter will be installed <br /> within the pump control panel to document recovered volumes. <br /> 5.4 Site Closure <br /> - An estimate of the timeframe of remediation is difficult to <br /> make due to uncertainties regarding aquifer properties and <br /> the true distribution of dissolved hydrocarbons in the <br /> subsurface. The reduction of dissolved levels will be <br /> monitored over the quarterly sampling rounds and an effort <br /> made to predict total remediation time. <br /> Request for site closure will be based upon the sampling <br /> results over at least one complete hydrologic cycle. <br /> 6.0 REFERENCES <br /> ySan Joaquin County Flood Control and Water Conservation <br /> District, 1975, 1980, 1984, 1987, Semi-Annual Groundwater <br /> Reports <br /> 6 <br />