Laserfiche WebLink
removed from MW-1 during development. The remaining monitor wells were <br /> all developed by removing <br /> well. approximately 55-gallons of water from each <br /> As previously stated, soil borings SB-1 through -5 were all drilled to <br /> 17.5 feet below ground surface. These borings were backfilled with the <br /> aforementioned cement grout mixture from total depth to ground surface. <br /> All grouting operations were witnessed by a S.ILHD site inspector. <br /> Groundwater Semnlinv <br /> Groundwater samples were collected for TPki-G and VOA analysis by Modified <br /> EPA Method 8015 and EPA Method 602, respectively, from each monitor well. <br /> Monitor wells MW-1, -3, and -6, which showed the presence of elevated <br /> r' concentrations of VOAs, were also sampled <br /> for ethylene dibromide (EPA <br /> I Method 504) and organic lead (tetraethyl lead). The primary supply well <br /> and the backup supply well at the site were sampled for VOCs (EPA Methods <br /> a 601 and 602), ethylene dibromide (EDB) and total volatile hydrocarbons <br /> y (Modified EPA Method 8015). <br /> Monitor wells were allowed to equilibrate following construction for a <br /> period of not less than 12 hours prior to groundwater sampling. Prior to <br /> sampling, the top-of-casing elevation for each well was surveyed relative <br /> to an assumed datum of 20 feet mean sea level (MSL), as derived from the <br /> United States Geological Survey topographic map of the Lodi North <br /> Quadrangle, California and depth to water measurements were taken to <br /> determine groundwater elevations at each well. Before sampling, monitor. <br /> wells MW-1 through -8 were purged by pumping approximately 55-gallons of <br /> water from each well. Monitor wells MW-9 and -10 were bailed dry and <br /> allowed to recharge for approximately 5 to 10 minutes prior to collecting <br /> groundwater samples. Groundwater samples were collected from each monitor <br /> well with disposable, polyethylene, non-reactive bailers. Samples were <br /> collected at the supply wells from steel sampling ports after purging each <br /> well for approximately 15 minutes. Water samplas were tranferred to <br /> appropriate sample containers by filling from the bottom to top of the <br /> container to minimize sample aeration. Each sample container was <br /> individually labeled and placed on ice in a thermally insulated chest. <br /> All water samples were delivered to the appropriate analytical laboratory <br /> with an accompanying chain-of-custody form. <br /> Analytical Services <br /> Analyses for TPF! and VOAs in soil and groundwater samples were performed <br /> by Weston Analytical Laboratory of Stockton, California. Weston also <br /> conducted EDB analyses of groundwater samples taken from monitor wells MW- <br /> 1, -3, -6, and the primary supply well. McLaren Analytical Laboratory of <br /> Rancho Cordova, California performed the analyses of wster samples taken <br /> from the back-up supply well for VOCs, EDB, and total volatile <br /> hydrocarbons and analyzed additional water samples from the primary supply <br /> well for total volatile hydrocarbons. <br /> 12 <br />