My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007433
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
4614
>
3500 - Local Oversight Program
>
PR0545770
>
ARCHIVED REPORTS_XR0007433
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:20:07 PM
Creation date
6/9/2020 2:21:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007433
RECORD_ID
PR0545770
PE
3528
FACILITY_ID
FA0006278
FACILITY_NAME
WOODBRIDGE VINEYARD ASSOC
STREET_NUMBER
4614
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
4614 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INC <br /> APPENDIX it <br /> SOIL AND GROUNDWATER SAMPLING PROTOCOL <br /> 10 EXPLORATORY EXCAVATION PROCEDURES <br /> The lateral and vertical extent of sal hydrocarbon contamination at the subject property <br /> will be determined by surface excavation procedure to attempt clean closure The area <br /> to be excavated will be immediately around the location of the existing above ground <br /> storage tank The excavation plan will provide for a pit extending vertically downward from <br /> the area of maximum surface contamination Equipment will be able to excavate material <br /> to a maximum depth of approximately 30 feet, if necessary <br /> A California State Certified Engineering Geologist will supervise excavating operations <br /> He will review and supervise the separating and stockpiling of the clean and contaminated <br /> soil, make onsite changes in excavation geometry, and record encountered geologic and <br /> • hydrocarbon contamination conditions as observed in the field Excavation of <br /> contaminated sal will continue until soil that is believed to be uncontaminated is reached <br /> both vertically and laterally along the sides and bottom of the pit Soil samples will be <br /> obtained along the walls and floor of the excavation laterally every 50 feet, or as <br /> appropriate, and will be analyzed for specific constituents as outlined in the workplan The <br /> excavation process will continue until non-detect soil contamination levels are reached for <br /> all walls and floors of the pit Appropriate fencing material will be placed around the <br /> excavation to prevent unauthorized entry After regulatory approval the excavation will be <br /> backfilled <br /> APPENDIX Il <br /> 19150011 030 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.