Laserfiche WebLink
SBIMW # MW-2 <br /> = - SOIL DRILLING LOG # D- <br /> Page z at 2 <br /> McLaren Environmental Engineering Sampler P PHILLIPS <br /> PROJECT SEBASTIANI VINEYARDS LOCATION 4614 W TURNER RD , LODI, CA <br /> ELEVATION 14 65' • MONITORING DEVICE HNu <br /> SAMPLING DATE(S) 5-15-89 START 1515 FINISH 1800 <br /> I SAMPLING METHOD HSA SUBCONTRACTOR & EQUIPMENT 13EYLIK DRILLING CO. <br /> f MEMO ADDITIONAL WELL CONSTRUCTION DETAILS IN REPORT TEXT, IR-TH10 <br /> ARBITRARY DATUM OF 20' <br /> Penetration � o <br /> a .. Results <br /> m m m m m E Soni Descnpiion = cn Well Construction <br /> U <br /> Slows <br /> n m E d Color, Texture, Moisture,Etc = jy� /�� ��/� Details <br /> Cl V J 6"-5--6" m U) — Z V C7 V) <br /> SM <br /> 33 5'- 34' <br /> 35' <br /> 11-23-28 35 0' 40 } <br /> Dark yellowish brown (10YR Sentonite <br /> 414)silty clay, firm, medium CL <br /> plastic, elastic, moist <br /> 38 5'- Light brownish gray (10YR <br /> 40' 9-21-33 40 0' 4 CL <br /> 6/2) very soft, highly plastic, ; <br /> 21-62-25 40 0' elastic very moist 41' T D <br /> 41 0' 118067 6 <br /> 1 LLG'zt,d-� <br /> • SIGNA RE OF FIELD SUPERVISOR SiGP�TURECF REVIEWER <br /> SENIOR GEOLOGIST CALIFORNLA,C E G 1404 <br /> TITLE TITLE <br />