My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
1625
>
2900 - Site Mitigation Program
>
PR0516555
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 10:46:17 AM
Creation date
6/9/2020 2:37:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516555
PE
2950
FACILITY_ID
FA0012676
FACILITY_NAME
RO TILE LLC
STREET_NUMBER
1625
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
LODI
Zip
95240
APN
06205013
CURRENT_STATUS
01
SITE_LOCATION
1625 S STOCKTON ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced GeoEnvironmental, Inc. <br /> SITE HEALTH AND SAFETY PLAN <br /> AGE-NC Project Number: 00-0782 Prepared By:Brian Millman <br /> Project Name: Ro-Tile, LLC Date: 24 October 2000 <br /> Project Location: 1625 South Stockton St., Lodi, CA Project Manager:Brian Millman <br /> Anticipated Start Date: November 2000 Duration:8 hours <br /> 1.0. SITE DESCRIPTION <br /> Area affected: Proximal, immediate area around probings <br /> Surrounding population: Commercial <br /> Topography: Flat Weather Condition: warm <br /> Additional information: <br /> 2.0. ON-SITE ORGANIZATION AND COORDINATION <br /> Project Team Leader: Brian Millman <br /> Site Safety Officer: Brian Millman <br /> Field Team Officer: Brian Millman <br /> Field Team Members: Brian Millman <br /> Local Agency: San Joaquin County Public Health Services - Environmental Health <br /> Division <br /> Brian Millman has been designated to coordinate access control and security onsite. A safe <br /> perimeter will be established at 15 feet around boring/excavation.No unauthorized person should <br /> be within this exclusion area. <br /> 3.0. HAZARD EVALUATION <br /> The following substance(s) or hazards are known or suspected to be on site. <br /> SUBSTANCES INVOLVED: CONCENTRATIONS: <br /> Diesel ND <br /> MTBE Unknown <br /> BTEX IND <br /> The primary hazards of each are identified as follows: <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.