Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> PROJECT NAME-. AIDC PUMP &WELDINM SAMPtkANAILYS S PERFORMED ;TPH Gas, B.T X-E, <br /> 1211 S,,TURNPIKE RdAd 'AhlIKE `IMS: 1-6A$ <br /> STOCKTON, CA 952 AmIg a mNan(s): 2 V.0 A,''$& I SAILS <br /> SLANK/MCL <br /> 14ALYSIIS PaFtFEyRm EIS BY: POL LABS <br /> CLIENT HUNTER & ASSOCIATES DATE 07/13/1995 <br /> PROJECT MANAGER BILL HUNTER AMPLE LOCATION MW-3 <br /> AMPLER. DON LIGHT TART TIME <br /> ROUNDWATER XXXTADOSE THER P I D WELL HEAD READING 139 PPM <br /> CASING ELEVATION (FEET MSL) CASING DIAMETER 2 INCH <br /> DEPTH TO WATER: 36 36 FEET CALCULATED CASING VOLUME 2 07 GAL <br /> DEPTH OF WELL: 50 02 FEET [TOTAL VOLUME PURGED 10 0 GAL <br /> TIME ,� , PH <br /> , , ,R1Sf1Ir` fr W# . COLOR OTHER <br /> gallvr v units 3 iirtihQsjbm ,0e91� C Me"]) <br /> 0 7 2 1182 234 LT TURBID GAS ODOR <br /> 25 73 1193 229 , <br /> 50 73 1201 225 CLEAR <br /> 75 7.3 1202 225 " <br /> 100 73 1203 229 " <br /> PURGE METHOD GRUNDFOS 2" STAINLESS STEEL SUBMERSIBLE PUMP <br /> SAMPLE METHOD: 1' STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE- 36.52' DEPTH TO WATER AT SAMPLE TIME <br /> WELL INTEGRITY- CAP AND SEAL ARE SECURE, LOCK IS INSTALLED <br /> REMARKS DURING WELL DEVELOPMENT 44 GALLONS WAS PUMED <br /> WEATHER CLEAR SKIES, SLIGHT BREEZE OUT OF THE NORTH <br /> QUALITY CONTROL- ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER & ALCONOX <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION AT THE SOUTH END OF THE WASH AREA/ EAST END OF BUILDING <br /> CONTAINMENT DO T 17 DRUMS <br /> INSTRUMENTATION: ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />