Laserfiche WebLink
UNDERGROUND STORAGETANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Paye 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: <br /> If you already have a site plan that shows all required information,you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels, 2) in-tank liquid level probes (lf used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault;4)devices monitoring product piping;5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps, 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas. <br /> U ST Monitoring Ob Plan <br /> ----------- ------ --. -.. ------------------------------------------------------------------------------------ <br /> SimAddress: i Escalon Mini Mart Valero-1097 E Yosemite Avenue Escalon,CA 95320 <br /> ❑ F= It <br /> ILLSL� <br /> F=FII.LS <br /> T=TL'FBL\'E <br /> ATG P=PROBE <br /> V=VAPOR <br /> %=SLI IP SENSOR <br /> • - L=Leak Detector <br /> Y. si=]fantcav <br /> O. B=Brine Sensor <br /> S. I=Smart Sensor <br /> E. S=STP <br /> M- C=Float;&Chains <br /> E=E Stop <br /> 2. x . . x <br /> . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . <br /> 0 <br /> . . . . . _ . <br /> . . . . . . . . . . . . . Tx <br /> ' - . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . P g7 , <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> apDT4g+ <br /> ( B) F <br /> Drawing of piping <br /> exit of sump and . . . . _ . Tx <br /> L'DC's.::o . . . . - . . <br /> underground . . . . . . . . . - .57 . <br /> dratrsg is acc-=.te. r <br /> We cacao: a - - <br /> :peculate blu= <br /> In, trexr rrraa•I roar are rror mi:ible so rim cerrUifxg ra hxicram�e a <br /> frgre-.iornl opiraort ori;aryl eve_deh jcr trforxmtoml prap¢a.Drawirg <br /> nor <br /> to scde <br /> Date map was drawn 12113/2017 <br /> Instructions <br /> If you already have a diagram that shows an required information-you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> shcvs the general layout of tanks and piping. Clearly identify locations of the following equipment.if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces.sumps,dispenser pans,spill containers,or other secondary containment areas:mechanical cr e'e_ronr line leak detectors;and in-tank liquid level <br /> probes(if used for leak detect+onj. In the space provided.note the date this Site Plan was prepared. <br /> LEGEND <br />