My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1607
>
3500 - Local Oversight Program
>
PR0545774
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 3:33:46 PM
Creation date
6/10/2020 12:11:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545774
PE
3526
FACILITY_ID
FA0004998
FACILITY_NAME
COMFORT AIR
STREET_NUMBER
1607
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1607 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State Water Resources Control Board <br /> Division of Clean Water Programs <br /> Street•Sacramento,Cal ifomia 95814-(916)227-4411 <br /> Winston H. Hickox 2014 T S - <br /> Secretnryjor M ling Address: P.O.Box 944212•Sacrarnento,Califptpi?.9A.244-1120 1.t <br /> FAX( 16)227-4530•Intemet Address: ht //wwwswrcb�4.lt�igbv/+Gwe�yrpf 2 Cray Davis <br /> Environmental �' • 45 Governor <br /> Protection <br /> MAY 2 5 200C <br /> Greg Gaut <br /> Comfort Air <br /> 1607 Turnpike Rd <br /> Stockton, CA 95206 <br /> UNDERGROUND STORA E TANK CLEANUP FUND PROGRAM, NOTICE OF ELIGIBILITY <br /> DETERMINATION: CLAI 0 NUMBER 015533; FOR SITE ADDRESS: 1607 TURNPIKE RD, <br /> STOCKTON <br /> Your claim has been accepte I for placement on the Priority List in Priority Class "C"with a deductible <br /> of$5,000. <br /> We have completed our initi 1 review. The next step in the claim review process is to conduct a <br /> compliance review. <br /> Compliance Review: Staff i views, verifies, and processes claims based on the priority and rank within <br /> a priority class. After the Bo rd adopts the Priority List, your claim will remain on the Priority List until <br /> your Priority Class and rank a reached. At that time, staff will conduct an extensive Compliance <br /> Review at the local regulator agency or Regional Water Quality Control Board. During this Compliance <br /> Review, staff may request ad itional information needed to verify eligibility. Once the Compliance <br /> Review is completed, staff w 1 determine if the claim is valid or must be rejected. If the claim is valid, a <br /> Letter of Commitment will b issued obligating funds toward the cleanup. If staff determine that you <br /> have not complied with regul tions governing site cleanup, you have not supplied necessary information <br /> or documentation, or your cla in application contains a material error, the claim will be rejected. In such <br /> event,you will be issued a N tice of Intended Removal from the Priority List, informed of the basis for <br /> the proposed removal of your claim, and provided an opportunity to correct the condition that is the basis <br /> for the proposed removal. Yc ur claim will be barred from further participation in the Fund, if the claim <br /> application contains a materierror'resulting from fraud or intentional or negligent misrepresentation. <br /> Record keening: During your cleanup project you should keep complete and well organized records of all <br /> corrective action activity and ayment transactions. If you are eventually issued a Letter of Commitment, <br /> you will be required to submit (1)copies of detailed invoices for all corrective action activity performed <br /> (including subcontractor invo es), (2) copies of canceled checks used to pay for work shown on the <br /> invoices, (3)copies of technic il documents(bids,narrative work description,reports), and(4) evidence <br /> that the claimant paid for the i rork performed(not paid by another party). These documents are necessary <br /> for reimbursement and failure to submit them could impact the amount of reimbursement made by the <br /> Fund. It is not necessary to s bmit these documents at this time;however, they will definitely be <br /> required prior to reimbursem nt <br /> Compliance with Corrective A tion Re uirements: In order to be reimbursed for your eligible costs of <br /> cleanup incurred after Deceint Pr 2, 1991, you must have complied with corrective action requirements of <br /> Article 11, Chapter 16, Divisic n 3, Title 23,California Code of Regulations. Article 11 categorized the <br /> corrective action process into I hases. In addition, Article 11 requires the responsible party to submit an <br /> .91MO,rJ71.9 ER v1TVnmeate1 Protection Agency <br /> Ped Recyc%d Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.