My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1607
>
3500 - Local Oversight Program
>
PR0545774
>
ARCHIVED REPORTS_XR0007004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 10:22:31 PM
Creation date
6/10/2020 12:15:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007004
RECORD_ID
PR0545774
PE
3526
FACILITY_ID
FA0004998
FACILITY_NAME
COMFORT AIR
STREET_NUMBER
1607
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1607 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water samples collected in previous monitoring events indicate that groundwater is impacted <br /> to the north, west and south of the tank cavity. The present investigation indicated that low <br />' concentration of petroleum hydrocarbons are present near the eastern edge of the site It <br /> is likely that MW-5 is located near the downgradient (eastward) extent of the impacted <br />' groundwater plume. <br /> However, the concentrations of toluene and xylenes in MW-5 do not exceed the State of <br /> California Maximum Contaminant Levels (MCL) or Action Levels (AL) for drinking water <br /> The AL for toluene is 100 ppb, the MCL for xylene is 1,750 ppb <br />' A limited pumping of MW-2 or MW-3 has been proposed to determine the effect of Iimited <br /> groundwater extraction on the contaminant plume Upon approval from Comfort Air, Inc, <br /> the limited extraction will be scheduled during the next quarter The next quarterly <br /> Imonitoring event should be scheduled in September 1994 <br />' 6.0 LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily <br /> exercised by environmental consultants practicing in this or similar locahties The findings <br /> were based upon analytical results provided by an independent laboratory Evaluations of <br /> the geologw/hydrogeologic conditions at the site for the purpose of this investigation are <br /> made from a limited number of available data points (n a monitoring wells, soil samples) <br /> and subsurface conditions may vary away from these data points No other warranty, <br /> expressed or implied, is made as to the professional recommendations contained in this <br /> rreport <br /> I <br /> t�,1,P1 nrdq sem .. 9 <br /> CenbM1 1[9Y IaUIT SJ14,Rrr1991 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.