Laserfiche WebLink
ACME-STOCKTON GALVANIZING WORKS <br /> Site information The property owner is funding the site characterization <br /> ' and remedial action at the site State Bond funds may <br /> Location and Type of Site be expended for oversight actmttaL <br /> 540 West Scotts Avenue <br /> Stockton, CA 95203 <br /> San Joaquin Project Completion Estimates <br /> Acme Galvanizing was in operation prior to The estimates shown below mnect completion of major <br /> February, 1982. A molten zinc dip bath was used to site cleanup phases based on current information <br /> ' coat metal objects that were cleaned using sulfunc acids regarding this site and responsible party cleanup plans <br /> and caustic The site was closed when the zinc bath and completed actions. <br /> developed a leak and caused molten zinc to spill onto <br /> ' Estimated <br /> the ground <br /> Task Group �� <br /> Description of Hazardous Wastes Site Characterization <br /> Acid soil,lead and zinc are the principle contaminants at Remedial Action Order Completed <br /> this site Remedial invesiigalsoM Mar.1989 <br /> Feasibility Study <br /> Threat to Public Ilealth and Environment <br /> The sod is contaminated to at least 12 feet. Ground Remedial Action Pian June 1989 <br /> water may be affected, but has not been sampled. <br /> Ground water contamination would provide the most Remedial Action <br /> likely pathway for human contact In the area. Design Aug.1989 <br /> Implementation Oct. 1989 <br /> Certification Dec.1989 <br /> Site Status Cost Recovery and/or <br /> Operation and Maintenance <br /> Status of Site Activity Cost Recovery Dec.1990 <br /> A preliminary invesugation indicated high levels of zinc Operation and Maintenance Y • 0-10 years <br /> and lead contamination in the soil DHS issued the final <br /> RAO on November 17, 1987 A RM work plan was <br /> submitted to DHS on February 1, 1988. A revised <br /> ' RITS work plan was approved on August 10, 1988. ' <br /> Projected Revenue Sources <br /> Potential Responsible Party- <br /> Acme <br /> artyAcme Galvanizing Company, Inc. <br /> 1655 17th Street <br /> Oakland, CA 94607 <br /> Property Owner <br /> Ms Randolph G Sheridan <br /> 3563 Gresham Court <br /> t Pleasanton, CA <br /> DHS has budgeted $50,000 for related direct costs <br /> DHS will recover 100 percent of direct costs plus staff <br /> ' costs and overhead related to the project. The <br /> responsible parties will pay all costs associated with <br /> remedial investigations and cleanup activates. <br /> THE DEGREE Or HLAL.TH BAZARD roarD RY CHEMICAL CONTAMINATION Or A SITE DF?INDS ON TRI CONCIIN UTION Or Tilt mATCRIAL rRESENT AND <br /> THE DURATION Or t7QOBURt. DHS roLiCY IS TO EVALUATE ALL LLWW HAZARDOUS SUBSTANCE RELrASt am roR Tint NEED TOTARI ACTION TO ABATE <br /> ANY ACUTE rU&UC RMTH OR ENVIRONMENTAL THREATS MW BY A SrM THERETORE.THE THREATS 011WRINED IN THIS DCKVWVhCr GENERALLY <br /> - �..-.........v 9.nn jieeumcvLmmmir.1%TNRBrITit1iOTABATt6l1 Tilt StB1WCES <br /> 1 <br />