i <br /> TENTATIVE SCHEDULE <br /> iThe following Is a tentative schedule for completion of the scope of work proposed in this work plan, <br /> pending regulatory approval of the proposed scope of work and pre-approval of costs by the <br />' Underground Storage Tank Cleanup Fund (USTCF) <br /> • May 2002 Quarterly ground water monitoring <br />' a June 2002 Advancement of CPT boring and collection and analysis of ground water <br /> samples <br />' 0 August 2002 Abandonment ofMW-1, MW-2 and MW-4, based on the results of the CPT <br /> investigation,installation of ground water monitoring wells and Installation of ground water <br />' extraction wells Quarterly ground water monitoring <br /> • October 2002 Installation of temporary observation wells and performance of groundwater <br /> extraction feasibility tests In the former UST area <br /> i0 November 2002 Quarterly ground water monitoring <br /> • January 2003 Preparation of Problem Assessment Report <br /> i <br /> it <br /> i <br /> i <br /> I <br /> I <br /> i <br /> I <br /> I <br /> i <br /> Advanced GeoEnvironmental,Inc <br /> I <br />