Laserfiche WebLink
i <br /> i30 May 2005 <br /> AGE-NC Project No 95-0141 <br /> iPage 5 of 5 <br /> i Preparation of a work plan for Interim remediation of petroleum hydrocarbon-Impacted <br /> ground water at the site and vertical definition of the dissolved hydrocarbons and additives <br /> In the source area as previously proposed The western area,under the main office building, <br /> i appears to cover the highest dissolved mass at the site, therefore limited access technology <br /> may be required to assess hydrocarbon-Impact In this area <br /> i6.0. LINIITATION5 <br /> iOur professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> i upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site have been made from a limited number of available data points(i a monitoring <br /> wells and ground water samples) and subsurface conditions may vary away from these data points <br /> i No other warranty,expressed or Implied,is made as to the professional Interpretations,opinions and <br /> recommendations contained in this report <br /> I• <br /> i <br /> I <br /> i <br /> I <br /> I <br /> I <br /> • <br /> IAdvanced GeoEnvironmental,Inc <br />