Laserfiche WebLink
30 April 2005 <br /> AGE-NC Project No 95-0141 <br /> Page 10 of 10 <br /> • Preparation of a work plan for Interim remediation of petroleum hydrocarbon-impacted <br /> ground water at the site and vertical definition of the dissolved hydrocarbons and additives <br /> in the source area as previously proposed The western area under the main office building <br /> I appears to cover the highest dissolved mass at the site,therefore limited access technology <br /> may be required to assess hydrocarbon-impact in this area <br /> 7.0. LIMITATIONS <br /> IOur professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site have been made from a limited number of available data points(i a monitoring <br /> wells and ground water samples) and subsurface conditions may vary away from these data points <br /> I No other warranty,expressed or Implied, is made as to the professional interpretations,opinions and <br /> recommendations contained in this report <br /> r� <br /> r <br /> r <br /> i <br /> i <br /> • <br /> Advanced GeoEavironmental,Inc <br /> I <br />