Laserfiche WebLink
1 11 August 2004 <br /> . AGE-NC Project No 95-0141 <br />' Page 5 of 5 <br />' 5.0. RECOMMENDATIONS <br /> Based on the results of this and previous Investigations, AGE recommends <br />' 0 Continued quarterly monitoring of the ground water monitoring network <br /> • Preparation of a work plan for interim remediation of petroleum hydrocarbon-impacted <br />' ground water at the site and vertical definition of the dissolved hydrocarbons and additives <br /> The western area under the main office building appears to over the highest dissolved mass <br />' at the site, therefore limited access technology may be required for this portion of the <br /> investigation <br />' 6.0. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar Iocalities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br />' conditions at the site have been made from a limited number of available data points(i a monitoring <br /> wells and ground water samples) and subsurface conditions may vary away from these data points <br /> No other warranty,expressed or implied, is made as to the professional interpretations,opinions and <br />' recommendations contained in this report <br /> I <br /> Advanced GeoEnvironmental,Inc <br />