Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br />XVI. MONITORING SITE PLAN <br />Date site map was prepared: <br />If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br />Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br />if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br />annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br />monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps, 9) devices monitoring under-dispenser containment; 10) <br />line leak detectors; and 11) devices monitoring any other secondary containment areas. <br />Sde Address: WESTERN FOOD & FUEL 3032 E. WATERLOO ROAD STOCKTON, CA 95205 <br />KEY <br />A= ANNULAR Sensor <br />F = FILLS <br />. . . . I I V =V.VOR <br />1., . .2 . ... - .3 ,A .. , .. 9. s _ P = PROBE <br />L = Turbine I Leak Detector <br />X=STAIP SENSOR <br />B = Brine Sensor <br />S = Smart Sensor <br />87., mir - C=Floats & Chains <br />E = E Stop <br />�T *PIPLNG } <br />T (ARROWS) <br />- . . _ . Drawing of pipes <br />S exit of sump and <br />..---._.-... UDC's.\o <br />underground <br />F drawing is accurate, <br />we cannot <br />speculate blue <br />F <br />rints <br />p. <br />. m''', ❑ <br />._.,. <br />P <br />j• <br />.._... 0 <br />F <br />E- <br />:1TG <br />Any items underground that are not rv-ible to the certifying <br />technician are a professional opinion only and are solely for <br />informational purposes. Drauring not to scale. <br />LEGEND <br />