Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection), 3) devices monitoring tank <br /> annular spaces or vault, 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> U ST Monitoring Site Plan <br /> D <br /> Site Address: 824 E Yosemite Ave Manteca 55336 <br /> . . . Drawing of pipes <br /> , • - . exit of sump and <br /> UDC' s. leo <br /> underground <br /> ?,Igoe cannot <br /> - I speculate blue <br /> Prints. <br /> . . <br /> 89 87 <br /> L L <br /> P X P X <br /> I . <br /> i <br /> Jay 9 L <br /> A = AN.NTL.kR ( R 1 <br /> F = FILLS P Y \J <br /> T = TURBINE <br /> P = PROBE <br /> V = VAPOR V <br /> X = SURIP SENSOR <br /> L = Leak Detector A <br /> F <br /> B = Brine Sensor <br /> I = Smart Sensor A <br /> S = STP <br /> C = Floats Rt Chains <br /> E = £ Stop I . . _ _ _ . <br /> YOSEMITE AVE <br /> Any iters underground that are not visible to the certifying technician are a <br /> professional opinion only and are solely for infoanatiowl purposes. Drawing not to <br /> sale. <br /> Date map was drawn 614119 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your sae plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed monitoring system control panels; sensors monaoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, orether secondary containment areas; mechanical or electronic line leak detectors; and in4ank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br /> LEGEND <br /> MIN 001 202fj <br /> s <br /> F\ 11R �', �IIVIEi�v(E , L ! HEALI i <br /> gFPART 4ENT'1 <br />