My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 4:40:58 PM
Creation date
6/11/2020 11:23:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of s) <br /> XII . LINE LEAK DETECTOR TESTING _ <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? © j ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified : © 3 GPH ❑ 0. 1 GPH - ❑ 0.2 GPH <br /> Was the testing apparatus properly calibrated ? <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leak is detected? �❑ ❑ <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a leak is detected ? © ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected ? Li � Li i <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ ! ❑ <br /> For electronic LLDs , have all accessible wring connections been visually inspected for kinks and breaks? ❑ ; ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? 1 ® ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? 1✓ ❑ ❑ <br /> For any answer of "N" above, describe In Section Xlll how and when these issues were or will be corrected <br /> XIII . COMMENTS — -- -_-- -_ -- <br /> j <br /> - - -_ _ — __ _ - ---- - -- --XIVo VACUUM VACUUM / PRESSURE ! HYDROSTATIC MONITORING EQUIPMENT TESTING _ <br /> Check this box if VPH monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. — <br /> System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component(S) Monitored By This Sensor Sensor Functionality jInterstitial Communication ` <br /> Test Test <br /> ❑ Pass ❑ Fail j ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail I [:] Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail -❑ PassF1 Fail <br /> _ ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> E1 ass 0 Fail L] Pass Q Fall <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail .1 <br /> ---- - - - <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> — ❑ Pass ❑_ Fail ❑ Pass ❑ Fail <br /> -- -- ( -- --- - -- - -- -- ❑ Pass - ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fail ❑ Pass Fail <br /> How was interstitial communication verified ? ❑ Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br /> ❑ Other IDescribe the method in section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "Fail' above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> i <br /> i <br /> I <br /> i <br /> i <br /> GPH = Gallons Per Hair, Y = Yes, N = No, NA = Not Applicabie, VPH = VaanAnPressuTeftdrostatic, ID = Identification <br /> I <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.