My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 1:58:01 PM
Creation date
6/11/2020 2:11:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annularspaces or vault,'4)devices monitoring product piping;5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping;8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas. <br /> U ST Monitoring Site Plan <br /> SitrAddrm: AL MARKET 8915 S EL DORADO ST STOCKTON,CA <br /> a rr.nnR Ann crierrT <br /> . . . . . . . . . . . . . . . <br /> . . . . . . . STORE <br /> . . . . . . . . . . . _ E. i .9. . . . . . . . . <br /> . . . . . . . 91._ IIE _ <br /> C <br /> . p L P L FC ] . <br /> GOx O a 7. 5 <br /> F <br /> L <br /> . . . . . . . . . . . . . . . . . . . . . . . . .4. . . . . . . . . . . .2. . . . - . . . <br /> BT._ . <br /> . . . . . . . . . . . . . . . . . . . . . C . . . . . C _ <br /> 9._ . . . .. .. . . . . .1.= . <br /> A <br /> T _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> H . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> E <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> S <br /> . . . . . . . . . . . . . . . . . . <br /> R . . . . . . . . . . . . . . . . . . . . . . . . . . ❑ TLS <br /> A <br /> . . . . . . . . . . . . . . . . <br /> O S <br /> �I <br /> O <br /> . . . . . . . . . . . . . . . . . . . . . . . G <br /> . . . . . . . . . . . . . . . . . . OFFICE. <br /> .TO 1-5.. . . . . . . . . . . . . . . <br /> 1 - . . . . . . . . . . . CARBON <br /> . . . . . . _ _ . . . . . . U C.212NISTER <br /> *PIPING* . . . . . C() P.1 1£NTS <br /> (ARROWS) . _ . . <br /> Drawing of . . . . . . . . . <br /> pipir4 exit of _ _ . . _ . . . . pa <br /> sump and UDC'% - - - - - - A=A`i vtLkR Sensor <br /> No LmdartirouadF=FILLS <br /> drairng ss - V=VAPOR <br /> A.n_ Y..:it., tudtrerauad that at not ivibk to the certfy-^•terbnieiau we a <br /> accurate;ive <ional opinion anl}' P=PROBE <br /> catmot speculate 1�e° and are seleh for iafomvtsenal poses.TJranivg net-c L=Turbine Leak Derector <br /> h'11eprints. -l'=S line ewor R <br /> B=Brine Beacon <br /> Date map was drawn: 51820 S=Smart Seacor <br /> C=Float;&chain: <br /> F=E Stop <br /> Instructions <br /> If you alreacy have a diagram that shows a,i regJred information.you may mcluce a.rather than this page.with your Monitoring System Certification. On your site plan. <br /> shcyr tre;eneraj layout of tanks and piping. Clearly identify locators of the fallowing equipment.4 installed-monitoring system cortnol panels;sensors monitoring tank <br /> ar:nula spaces,sumps,dispenser pans,spill containers,or other secondary containment areas:mechar,sal or electronic line leak detectors:and in-tank liquid level <br /> ,robes if used fcr'eat detection). In the spare provided,note the date this Site Plan was prepared. <br /> LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.