Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: <br /> If you already have a site plan that shows all required information,you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annularspaces or vault;4)devices monitoring product piping;5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping, 8) devices monitoring vent/transition sumps;9) devices monitoring under-dispenser containment, 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas. <br /> Site Address: Tracy lE_2d20 W Grant Line Road Tracy.CA 95376 <br /> KET <br /> A=xxxt: AR Sensor <br /> F=FILLS . . . . . . . <br /> C=VAPOR . . . CAS . . . <br /> P=PROBE <br /> . . . . . . . . . . . . <br /> L=Turbias I Leak Detector . . . . . . <br /> %=SII]1p SENSOR . . . . . . . <br /> B=BNot Sensor <br /> S=Smart Semor <br /> C=Float;d C13 Rim <br /> E-E Srop <br /> ATG <br /> .91_ . <br /> x C C <br /> p . . . . . <br /> V <br /> F . . . . . . . . <br /> P L <br /> x <br /> - - 719 <br /> *PUTiG <br /> Drafting of pipes <br /> . O p exit o sump and <br /> . C's.F UDXo <br /> F mdezEround <br /> A drattmg is <br /> . . . . . . . A accurate.the <br /> . . . . . . . . . . . cannot speculate <br /> 87 _ _ ❑SL Vue prints. <br /> . . . . . . . . . . . . . <br /> _irp•irencrtn rgrorvdt1r_z.,renorrisibletot1rcernr rt'. rxJninarrarea <br /> pgfossiaratiapfriararrl•.arrinresrdeit.�crnfarnntorzri{xngz. a-aiarf <br /> ror to scde <br /> Date reap was drawn 05iiik15. <br /> Instructions <br /> If you already have a diagram chat shows all required information.you may include_o,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify localions of the following equipment.if installed.monitarmg system control panels;sensors mon:tonag tank <br /> annular spaces,sumps.dispenser pans,spill containers,or other secondary containment areas mechanical or electronic line leak deters:and in-tank liquid level <br /> probes(if used for leak detecticny. I7 the spars prdv+ded,note the date this prlparerd. _ <br /> LEGEND <br /> ZMR <br /> JUN 0 i 2020 <br /> ENVIRONMENTAL HEA H <br />