Laserfiche WebLink
UNDERGROUNDSTORAGETANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) <br /> XII. LINE LEAK DETECTOR TESTING <br /> ❑Check this box if line leak detectors(LLD)are NOT installed.(Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? 1:1 El <br /> all that apply.) Simulated leak rate verified: X3 GPH El 0.1 GPH E] 0.2 GPH <br /> Was the testing apparatus properly calibrated? Q ❑ ❑ <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ 0 <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? ❑X ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? ❑ ❑ Q <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ ❑ X <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ ❑ X❑ <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? ❑ ❑ X❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? 0 ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? Q ❑ ❑ <br /> For any answer of"M'above, describe in Section X111 how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM/PRESSURE/HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑X Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) ❑Vacuum ❑Pressure ❑Hydrostatic <br /> Sensor ID Component(S)Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> ❑Pass ❑Fail ❑Pass [-]Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail I ❑Pass ❑ Fail <br /> How was interstitial communication verified? ❑Simulated Leak at Far Ends of the Interstitial Space El visual Inspection <br /> ❑Other Describe the method in section XV below. ❑Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑Yes ❑No(Describe the reason in section XV below.) <br /> For any answer of"Fail'above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH=Gallons Per Hour,Y=Yes,N=No,NA=Not Applicable,VPH=VacuumlPressureMydrostatic,ID=Identification <br />