My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:16 PM
Creation date
6/11/2020 2:30:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: 12/3/2020 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM(Page 6of6 <br /> XVL MONITORING SITE PLAN <br /> Date site map was prepared: _ o Z8 <br /> 7you already have a site plan that shows all required information,you may include it,rather than this page,with your Monitoring System Certification <br /> Form. The site pian must show the generei layout or tanks and piping and claarty identify locations of the lalfowing equipment,if insfaRed.• 1)monitoring <br /> system control panels;2)in-tank liquid level probes{A used for desk defection);3)devices monitoring tank annular spaces or vault;4)devices monitoring <br /> product piping;5)devices mowtunng(10 piping;6)devices manlfodng vent piping;7)devices monitoring vapor recovery piping;8)devices monitoring <br /> ventiransition sumps;9)devices monitoring undar-dlspensercontainment,10)line leak detectors.and i t)devices monitoring any other secondary <br /> containment areas, <br /> 7.3 <br /> pzo8 N- <br /> $7 � � asjaX Srrt <br /> P r_-3 Q' <br /> 91Z-� !1 r ZoS <br /> P99 <br /> ( ql.r <br /> �Zs$lIJ CJ St'I L.4 V 5 <br /> L-2 ta�Z anr`u(�ri <br /> Z111 yzo <br /> CO E3 <br /> 7 M <br /> LEGEND <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.