Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page s of s) <br />XVI. MONITORING SITE PLAN <br />Date site map was prepared: 5/4/2020 <br />If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br />Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br />if installed. 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br />annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br />monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps, 9) devices monitoring under-dispenser containment- 10) <br />line leak detectors; and 11) devices monitoring any other secondary containment areas. <br />i <br />Srte Address: COLLIER RD CHEVRON 25551 N My 99 ACAMPO CA 95220 <br />I <br />*PIPDVG <br />(ARROWS) <br />Dram=_ of x s u y wvnbt <br />pump= edt of - - - <br />snnip a-ti CSC s. rsr <br />\o tmder-rounj S� <br />draii� is . . . . . . . . . . . c: E, . . . . . . <br />ec .... ............... MA 8 020 <br />cannat specaata <br />blue prints. <br />. . . . . . . . . . . . . . . . . . . <br />......._ <br />:::::::::: : F iVI-RONMEN: HE,ALT <br />............ <br />..... ....DEPART AT <br />... .... ... .. KEY <br />. . . . _ . . . . . . . . . . . . . -ANN-ULAR <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F=FILLS <br />. . . . . . . . . . . . z . . . . . . . . . . . . . _ . . . . . . . T = TL RBi\7E <br />. . . . . . . . P = PROBE <br />. . _ . . . . . . . . . . . - V=V.VOR <br />. . . . . . . . . . . . . . . . . . . . . . . . . - . . - . . . . %= SLZIP SENSOR <br />. . . . . . . . . . . . . . . . . . . . I . . . . . . . - L = Leak Deteetor <br />. . . . . . . . . . . . . . . - . . . - af=Nfanway <br />B = Brise Sensor <br />I = Smart Sensor <br />X L S=STP <br />T C = Float: & Chains <br />L E=E Stop <br />87 <br />91 DIE <br />/1 VENTS <br />f t O O <br />-ir{i ima; underground ritot ars nor i cihls !o r.�e rsr!(fiirg tcrb!icirut ars a <br />prgfstsional opinion ont; and are solah for utfo»r:a!ionuip:uposcs. Drmang <br />no: to scale <br />Date map was drawr: Y2949 <br />Instructions <br />I1 you alas_y have a diagram that shows a". required information you may include a, rather than this page, with your Monitoring system Certification. On your site plan, <br />shcw tre _enera: layout of tanks and piping. Clearly dentify ldcatens of the following equipment. I installed monior,ng system ccrtrcl panels; sensors neonito8ng tank <br />annular spaces, sumps. disp=enser pans.. spill containers, or other seecordary containment areas. mechanical cr electron c line leak detectors; and in-tank liquid level <br />crobes fif used for teak de^ectoro- lithe spat=_ p�dvded, note tte dat=e this Sde Plan was prepared. <br />LEGEND <br />