Laserfiche WebLink
UNDERGROUNDSTORAGETANK <br />SECONDARY CONTAINMENT TESTING REPORT FORM (Page 2 of s) <br />V. TANK SECONDARY CONTAINMENT INFORMATION <br />Manufacturer Identify Tank ID from Section III for each Manufacturer <br />XERXES A p <br />I B D <br />IC x <br />D <br />A❑ <br />I B <br />1 C❑ <br />I D❑ <br />Test Method Used: <br />❑ Manufacturer Guidelines (Specify): <br />p Industry Code or Engineering Standard (specify): PEI/RP1200-17/Fiberg lass Tank/ -10" <br />Hg. 1 Hour <br />❑ Engineered Method (Specify): <br /># <br />Attach the testing procedures and all documentation required to determine the results. of Attached Pages2 <br />Tank Containment Testing Training and Certifications (List applicable certifications) <br />Expiration Date <br />ICC Service Technician #5246802 -UT <br />3/21/2021 <br />Underground Storage Tank Tester License #90-1120 <br />12/31/2022 <br />VI. COMMENTS <br />Provide any additional comments here. <br />Tank A is a 12K, Double Wall Fiberglass designated for Diesel. <br />Tank B is a 12K, Double Wall Fiberglass designated for Super 91 Octane Gasoline. <br />Tank C is a 12K, Double Wall Fiberglass designated for Regular 87 Octane Gasoline. <br />VII. PRODUCT PIPING CONTAINMENT TESTING INFORMATION <br />Manufacturer Identify Tank ID from Section III for each Manufacturer <br />Smith FRP A ❑x 1 <br />B <br />I C 0 <br />D❑ <br />A❑ I <br />B <br />I C❑ <br />I D❑ <br />Test Method Used: <br />❑ Manufacturer Guidelines (Specify): <br />❑x Industry Code or Engineering Standard (Specify): PEI/RP1200-17/Fiberglass Pipe/5 Psi 1 hour <br />❑ Engineered Method (Specify): <br /># of Attached Pages <br />Attach the testing procedures and all documentation required to determine the results. 2 <br />Product Piping Containment Testing Training and Certifications (List applicable certifications) <br />Expiration Date <br />ICC Service Technician #5246802 -UT <br />3/21/2021 <br />Underground Storage Tank Tester License #90-1120 <br />12/31/2022 <br />Interstitial Communication Verification Method Used: <br />Release pressure at end of Piping Runs at UDC's where applicable. <br />VIII. COMMENTS <br />Provide any additional comments here. <br />ID = Identification <br />