Laserfiche WebLink
11 fest Equipment Used: INCON TS-STS l:yuipment Resolution: 0.0001 <br /> F[r:]Yes[:]No[]NA <br /> DC# UDC# UDC# UDC# <br /> Portion of UDC Tested' <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes❑No❑NA ❑ Yes❑ No❑ NA ❑Yes Q No❑NA <br /> product and water)?' <br /> "Turbine shutdown response time <br /> Is system programmed for fail- ❑Yes❑No Q NA ❑Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑ NA <br /> safe shutdown?' <br /> Was fail-safe verified to be ❑ Yes❑No❑NA ❑ Yes❑No❑NA ❑Yes❑No❑NA ❑ Yes❑No❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: <br /> Initial Reading(Rt): — <br /> Test End Time: <br /> Final Reading(RO: <br /> Test Duration: 15 MIN 15 MIN 15 MIN 1 15 MIN <br /> Change in Reading R,:-RO: -- <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Result: ❑ Pass ❑ Fail Q Pass Fail Pass Fail Pass Fail <br /> Was sensor removed for testing? ❑ Yes❑No❑NA ❑ Yes❑No❑NA ❑ Yes❑No❑NA ❑Yes❑No Q NA <br /> Was sensor properly replaced and <br /> verified functional after testin��'? Q Yes❑ Na[:1 NA El Yes[:]No❑NA ❑YesE]No❑NA E] Ycs❑No❑NA <br />