Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT <br /> XIII.VAPOR RECOVERY PIPING CONTAINMENT TESTING INFORMATION (SECONDARY LINE) <br /> Manufacturer Identify Tank ID from Section 111 for each Manufacturer. _ <br /> A ❑ B ❑ C❑ D ❑ <br /> A❑ B ❑ C D ❑ <br /> Test Method Used: ❑ Manufacturer Guidelines: <br /> ® Industry Code or Engineering Standard: PEI/RP1200/Pressure Test/5 psi for 1 HR <br /> ❑ Engineered Method: <br /> Attach the testing procedures and all documents required to determine the results. #of Attached Pages: <br /> Vapor Recovery Piping Containment Testing Training and Certifications Expiration Date <br /> ICC Service Technician- <br /> Interstitial Communication Verification Method Used: <br /> XIV. COMMENTS <br /> XV.TURBINE/PRODUCT PIPING SUMP TESTING INFORMATION (STP SUMP) <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> AIS B ® C ❑ _ D❑ <br /> A B C D ❑ <br /> Test Method Used: ❑ Manufacturer Guidelines: <br /> ❑ Industry Code or Engineering Standard: <br /> ® Engineered Method: INCON T51000/Hydrostatic-15 MIN. <br /> Attach the testing procedures and all documentation required to determine the results #of Attached Pages: <br /> Turbine/Product Piping Containment Testing Training and Certifications Expiration Date <br /> Incon TS-STS-1007293709 3/27/2021 <br /> XVI. COMMENTS <br /> Tested 87 STP and DSL STP after repairs. <br />