Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 5/20/2020 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces orvault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vents1transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> 1,04118 ,,,,.A,,.,., „ d ,,... A ,.... <br /> Site Address: FLAG CITY CHEVRON 6421 CAPITOL AVE. LODL CA 95240 <br /> C4o0 . 4EIITS. . *PIPLCG t <br /> KEY VENT atIMP . (ARROWS) <br /> A = xNwx Aa Sensor Drawing of <br /> F = FILLS . . . . I piping exit of <br /> V = VAPOR sump and UDC's. <br /> P = PROBE No underground <br /> L = Turbine ILeakDetector 91 O canvtg is <br /> a <br /> Y = SUMP SENSOR accurate, eve <br /> cannot specu]ate <br /> B = Brine Sensor 87S 87 Al DIE . . . . . <br /> 5 = Smart Sensor blue <br /> C = Floats Chains r P <br /> E = EStop <br /> ti• <br /> L X <br /> El <br /> 12. . 3 <br /> . 4 , — E-iiT�Lno <br /> 1, . 1, 1, 1, . . - _ 2 _ . 1, . 1, 1, 1, . . T <br /> A 0 - .g L <br /> S <br /> it items ro.darground that are not visible to the certjfting reclmician area <br /> • prgfessiorral apnrian orrbe mid are sole(v for itt(m»rational pwpores. Draicir g <br /> sat to scale <br /> Date map ryas drawn: 5120/20 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring system Certfioation. On your sae plan , <br /> show Re general layout of tanks and piping. CLariy detuify locators of the following equipment, -d installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in•lank liquid level <br /> probes (if used for leak detectron). In the space provided, note the date this Site Plan was prepared. <br /> LEGEND <br />