My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2300 - Underground Storage Tank Program
>
PR0231732
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 9:31:05 AM
Creation date
6/11/2020 3:56:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231732
PE
2361
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> Test Method Developed by ❑ Manufacturer X Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure X Vacuum ❑ Hydrostatic <br /> Test Equipment Used: 4" McDaniel dial face gauge, vac pump <br /> Tank ID Tank 1 <br /> Tank Manufacturer Owens Cornin <br /> Tank Capacity 15000 <br /> Test Start Time 10:10 <br /> Initial Reading 10 Hg <br /> Test End Time 12:10 <br /> Final Reading 10 Hg <br /> Change in Reading 0 <br /> Pass/Fail Criteria 0 <br /> Tightness Test Results X Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer X Industry Standard ❑ Professional Engineer <br /> Test Type X Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: 4" McDaniel dial face guage, nitrogen <br /> Pipe Run ID Tank 1 Produ AST Product <br /> Pipe Manufacturer Smith Smith <br /> Test Start Time 10:30 10:35 <br /> Initial Reading 5 psi 5 psi <br /> Test End Time 11:30 11:35 <br /> Final Reading 5 psi 5 psi <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria 0 0 <br /> Tightness Test Results X Pass ❑ Fail X Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> 8. SUMP/UDC TEST <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.