Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: CA ARNG, 2000 Stimson RD, Stockton ---- -------- — -- — <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> L-1 UST Annular 420 sensor <br /> North <br /> L-2 UST STP 208 sensor L-5 An 0 <br /> L-3 Reel UDC 208 sensor O. <br /> Probe <br /> L-4 Trans Sump 208 sensor <br /> L-5 AST Annular 420 sensor <br /> . . . . . . . . . . . . . . . . . . . . . <br /> L-4 Trans Sump <br /> Vaporless LD 3000 Underground product 2',OK AS <br /> T. <br /> Line Leak Detector piping to AST <br /> i I <br /> -2 STP <br /> 15K USI <br /> Probe 0 — L-3 Reel UDC Aboveground piping <br /> Overspill 0 Underground product <br /> . 0 piping to loading reel <br /> L-1 Annular, <br /> Veeder-Root <br /> 10-21-2020 Note: This Reel UDC where we <br /> propose to replace a torn environ %4 conduit <br /> entry boot with a Brave split repair on two conduits <br /> . . . . . . . . . . . . . . . . . . . . <br /> 1 <br /> 13 Overfill Alarm E-Stop f <br /> Date map v�as drawn: /P / <br /> Instructions <br /> If you already have a diagram that shows all required information. you may include it, rather than this page,. with your <br /> Monitoring System Certification. ' On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed: monitoring system control panels- sensors monitoring tank annular <br /> spaces, sumps, dispenser pans, spill containers, or other secondary containment areas, mechanical or electronic line leak <br /> detectors; and in-tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br /> was prepared. <br /> Page of <br /> 05/00 <br />