Laserfiche WebLink
• Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: CA ARNG, 2000 Stimson RD, Stockton ---- <br /> L-1 UST Annular 420 sensor <br /> North _ <br /> L-2 UST STP 208 sensor L-5 Annular O <br /> L-3 Reel UDC 208 sensor <br /> ' Probe <br /> L-4 Trans Sump 208 sensor <br /> L-5 AST Annular 420 sensor <br /> L-4 Trans Sump <br /> Underground <br /> Vaporless LD 3000 product <br /> Line Leak Detector piping to AST <br /> F6R I ( <br /> O <br /> Probe 7 i 3 Reel UDC Aboveground piping <br /> Overspill— –Q / t Underground product <br /> . . O / piping to loading reel <br /> L-1 Annular - ---' <br /> — <br /> Veeder-Root <br /> 10-21-2020 Note: This Reel UDC where we <br /> propose to replace a torn environ '/4 conduit <br /> entry boot with a Brave split repair on two cond,iits <br /> ro <br /> (7---Overfill Alarm E-Stop, <br /> Date nap Naas dra\+n: <br /> Instructions <br /> If you already have a diagram that shows all required information, .ou may include it, rather than this page. with your <br /> Monitoring System Certification. ' On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br /> spaces, sumps, dispenser pans, spill containers, or other secondary containment areas, mechanical or electronic line leak <br /> detectors; and in--tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br /> was prepared. <br /> Page ' of 05/00 <br />