Laserfiche WebLink
} <br /> 0001 <br /> OPW 71So Overfill Materials Important <br /> Prevention ValvesI In order to prevent product <br /> Valve Body% Cast aluminum spillage from the Underground <br /> The GARB -certified OPW 71 SO Storage Tank (UST), properly <br /> va or ti ht Overfill Prevention Valve Float: Nitrile rubber, closed cell foam Y I maintained delivery equipment <br /> P g Valve : Aluminum and a proper connection at the <br /> is designed to prevent the overfill of f tight-fill adaptor are essential. <br /> underground storage tanks by providing Seals : Viton® Delivery personnel should <br /> a positive shut-off of product delivery. Upper & lower Drop Tube: Aluminum to managed and trained <br /> P P Y pp P I � to inspect delivery elbows <br /> The shut-off valve is an integral part of Plastic parts: Acetaland hoses for damaged and <br /> the drop tube used for gravity filling , Q missing parts. They should <br /> The OPW 71 SO allows easy installation Hardware: Stainless steel 01, always make certain there <br /> tA1/r is a positive connection <br /> (without breaking concrete) and requires <br /> Features <br /> between the adaptor and <br /> no special manholes. elbow. If delivery equipment <br /> � Simple, Easy and Quick is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two Installation — no excavation or or the elbow is not securely <br /> stage shut-off valve. When the liquid special manholes required, coupled to the adaptor, a <br /> Pserious spill may result when <br /> level rises to about 95 % of tank <br /> Economical — costs a fraction the OPW 71 SO closes, causing <br /> capacity, the valve mechanism is of ex ensive, com licated and a hazard and environmental <br /> released, closing automatically with p P contamination, <br /> the flow. This reduces the flow rate to difficult-to install valves. <br /> approximately 5 gpm through a bypass 40o Furnished Complete — supplied -a NOTE: The OPW 71 SO is <br /> valve. The operator may then stop the with new upper and lower drop tubes, designed for use on tight fill <br /> " gravity drop applications only. <br /> filling process and disconnect and drain mounting hardware and thorough 3 Do not use for pressure <br /> the delivery hose. As long as the liquid instructions for quick job site time. j fill applications. <br /> exceeds the 95 % level, the valve will 40� Completely Automatic Operation <br /> close automatically each time delivery — no prechecks to perform, no resets ® Retrofits Directly — for both new <br /> is attempted. and no overrides to be broken and existing tanks with 4 " fill risers. <br /> If the delivery is not stopped and the or abused . ® Quick Drain Feature — <br /> liquid rises to about 98% of tank w4op No Pressurization of the Tank — automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level . pressure is relieved. <br /> completely. No additional liquid can flow 410. Will Accept a Dipstick � Best Flow Rate in The Industry * <br /> into the tank until the level drops below <br /> a reset point. for Gauging • OPW Test Lab results <br /> NOTE : The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHJ) and 40. Completely Automatic faster fill times and reducing <br /> review local, state, and national codes to Operation — does not rely on the spill risk, <br /> determine the regulatory requirements alertness orspeed of response of the <br /> governing shut-off capacity in your P Speeds Delivery Operations <br /> region, as well as take into account delivery attendant for certainty of — product flows unimpeded into <br /> other considerations such as extreme overfill prevention . the tank until the hose " kick " that <br /> tank tilt. In all cases, the upper tube " <br /> Keeps the Top of UST Dry," accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements — provides a clear signal that the <br /> 6112 " to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level. <br /> off flow into the tank completely before bung fittings and the need for 4� Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation - in both two-point <br /> EPA requirements. o Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing additional excavation, manholes or <br /> 71 SO Instruction Sheet Order vent piping are required . <br /> Number: H15524PA <br /> z Look for this label for <br /> Listings andU C to authentic OPW wR <br /> Approved products. <br /> Certifications ResocalHamla Airurces Board i OPW 71SOM is EVR Approved for ESS <br /> MEE= , <br />