Laserfiche WebLink
I� it <br /> Underground Storage Tank <br /> Monitoring System Certification Form <br /> 7. LINE LEAK DETECTOR TESTING <br /> Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified: (Check all that apply.) Yes No NA <br /> 12 3 GPH 0 0.1 GPH In 0.2 GPH <br /> Has the testing a ratus been properly calibrated? do ❑ ❑ <br /> For emergency ge ierator tank systems, does the LLD create an audible and visual <br /> alarm when a leak is detected? <br /> For mechanical LL.Ds, does the LLD restrict the flow through the pipe when a ❑ ❑ <br /> release is detected? <br /> For electronic LLOs, does the turbine automatically shut off when a release is ® ❑ ❑ <br /> detected? <br /> For electronic LLE s, does the turbine automatically shut off if any portion of the ® ❑ <br /> monitoring systerr is disabled or disconnected? <br /> For electronic LLE s, does the turbine automatically shut off if any portion of the <br /> monitoring systefr malfunctions or fails a tightness test? <br /> For electronic LLE s, have all accessible wiring connections been visually inspected ❑ ❑ <br /> for kinks and brea s? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ <br /> Were all LLDs1RtJC4. <br /> med operational within regulatory requirements? ❑ 17LLD ID D Model Lines Monitored Pass Fail <br /> 1 L� Prod - 17 ' In In <br /> ❑ <br /> In <br /> ❑ ❑ <br /> 8 In <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> in ❑ <br /> Describe all answers marked`No'or`Fail'and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 4 of 6 <br />