My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 1:13:51 PM
Creation date
6/11/2020 5:00:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 6: APPLY GREASE TO DROP TUBE r <br /> Apply black moly grease to the inside diameter of the <br /> upper drop tube. Make sure coverage is completely <br /> around the tube as shown in Figure 6. -- <br /> i <br /> a <br /> Figure 8 <br /> NOTE.Testable inlet tube must have cable port in <br /> line witb float. Testable inlet tube bottoms out on <br /> stop,it does not bottom out on inlet Range. See Fig- <br /> ure 8A <br /> Figure 6 <br /> STEP 7: APPLY GREASE TO POLYPAK SEAT. <br /> Ensure that the polypak seal is installed on the inlet <br /> tube with the fip up as shown in Figure 9. Apply black <br /> moly grease to the polypak as shown. Make sure cover- <br /> age is completely around the polypak seal. <br /> € y <br /> E=nsure polypak <br /> lip is u p Cable port must be in <br /> line with float <br /> r' a <br /> Inlet <br /> Tube h, raiyok <br /> Figure 8A <br /> Testable Models Only <br /> +4liply grease <br /> around polypak SEE PAGE 8 FOR INSTRUCTIONS USING THE 77SO- <br /> TOOL• <br /> Figure 7 <br /> SEE PAGE 9 FOR INSTRUCTIONS USING THE 71 SO- <br /> STEP 8: INSTALL INLET TUBE TOOLC. <br /> Insert the inlet tube into the upper tube until the upper <br /> tube seats against the flange on the inlet tube. Ensure SEE PAGE 10 FOR INSTRUCTIONS USING THE 71 S <br /> polypak is inserted evenly and stays in inlet tube TOOLCT. <br /> groove. Note: testable 7 7SO models ending with u"rr+equire the <br /> 7150-TOOLCT ar modified 7150-TOOL or 71 SO-TOOLC <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.