Laserfiche WebLink
{ <br /> TL 489-0589-02 <br /> Page 15 <br /> 7 . 0 PROJECT TEAM <br /> A project manager, Mr. Harry D: Moore, RCE, RGE , will be <br /> � assigned to -this project to assure a single.,- source of <br /> 1ni <br /> responsibility and communication throughout the project: Mr. Matt <br /> y Bullis will be the project engineer assigned to coordinate the <br /> field and laboratory- work of other' individuals , involved. Ms. Lynn <br /> Yaeger will be the project analytical. chemist. <br /> 8.0 LIMITATIONS <br /> The proposed scope of work assumes the boring site will be <br /> accessible to a truck--mounted drilling rig at the time of our field <br /> t <br /> :. exploration and can be readily located in the field from existing <br /> site features. Costs incurred in 'making locations accessible will <br /> be charged at cost plus 15 percent. Your prior approval will be <br /> requested should this occur. We shall -not be 'responsible for <br /> damage to underground utilities or other installations unless they <br /> are accurately shown on the plans made available to us prior to our <br /> f field'loperation. <br /> Ourrofessional services will be <br /> p performed, our findings <br /> obtained , and our, conclusions prepared in accordance with <br /> generally--accepted engineering principles and practices. This <br /> warranty is :in lieu of all other warranties, either expressed -or <br /> implied. <br /> o <br /> { Fresno . Modesto- Visalia Bakersfield <br /> .i3 r <br />