My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
20913
>
2900 - Site Mitigation Program
>
PR0545720
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:22 PM
Creation date
6/12/2020 11:34:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545720
PE
2952
FACILITY_ID
FA0005524
FACILITY_NAME
A TEICHERT & SON INC
STREET_NUMBER
20913
Direction
E
STREET_NAME
STATE ROUTE 12
City
CLEMENTS
Zip
95812
CURRENT_STATUS
02
SITE_LOCATION
20913 E HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F4OL.) C11 `91 S 15 Ti i 12G1946,J 2 FROM He !m i r_.le../Le r r,e r., �r. T-808 P. 02 <br /> EIDER ENGINEERING INC. <br /> 37SO AUBURN BOULEVARD SUITE A <br /> SACRAMENTO,CALIFORNIA 96621 <br /> (918)972-6291 <br /> October 31, 1991 <br /> Linda Turkatte <br /> San Joaquin Co. Envir . Health <br /> FOB 2009 <br /> Stockton, CA 95201. <br /> RE: Teicherts Clement 'Wank <br /> Removal Site <br /> Dear ifs. Turkatte: <br /> As requested, three additional soil samples were taken from the <br /> sides at the excavation at a depth of 7 feet from original ground <br /> with the following results: <br /> Sample No. Benzene Toluene E-Benzene Xylene TPR <br /> West Wall � - <br /> EX-6 ND 3 . 7 ppm 5 .2 ppm 4.6 ppm 1000 ppm <br /> South Wall <br /> EX-7 ND ND LSD ND ND <br /> North Wall <br /> EX-8 ND ND ND ND ND <br /> Test EX-2 dated 10/3/91 also indicated 55 ,ppm TFH <br /> REVISED WORK PLAN <br /> Excavation: Excavate an additional 15 to 20 CY in the vicinity <br /> EX-2 & EX-6 . <br /> Field test sail with OVA meter until test results <br /> are near non--detectable level and no noticeable odor <br /> remains . <br /> Soil <br /> Samples: Take three (3 ) additional sail samples cif the newly <br /> excavated area for laboratory analysis. <br /> Tank Hole <br /> Backfill: When field testing indicates the tank hole is clean <br /> it will be backfilled with sand and capped with <br /> aggregate base rock . If the laboratory test results <br /> are not satisfactory, additional excavation will be <br /> made at a later date : <br />
The URL can be used to link to this page
Your browser does not support the video tag.