Laserfiche WebLink
u GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION E <br /> PROJECT NAME 4,r <br /> ��r �+( ��� PROJECT NUMBER S4 6�.�-�c�01 WELL NO <br /> PROJECT MANAGER r� TYPE OF WELL ✓ Monitoring Extraction Other <br /> RECORDED BY AF SAMPLED BY DATE 0 J30zo <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Wefl,easing Diameter <br /> :,/-2-inch 4-inch Other <br /> Bader - Type <br /> Y - <br /> Weif Total Depth 2 Pump Typecr-,-7 4-/rLg aG7 �a feet below Tap of Casing, TO Other - Specsfy <br /> Depth to Water / 2-3 feet below Top of Cas¢ng, WL Hydrocarbon Odes <br /> Yes Na <br /> Water Coiumn Length��feet <br /> Purge Volume Calculation (water Column Length x Multspder x No Voglumes = Calculated Purge Volume) <br /> �- X �/ + 7� X = r qD Calculated Purge Volume = Y0 Qailons <br /> (WCL) (Muftiplier) (No Volumes) Actual Purge Volume = f .lijo gallons <br /> Muk#lplter Canna Diameter [Incriest = Gaifonw4near foot) Z=o 17 4=a66 6=1 5 a=26 <br /> Groundwater Parameter Measurement LleterType�AO Calibrated ✓Yes No <br /> TIME ELAPSED FLCwRATr: DTW pH EG T TURSioITY REDOX COMMENTS <br /> TIME (GPfvt) I (ft) anhaslc n G (NTL') mV CK3 <br /> y% I <br /> 7 9, z3 61 D.3 I f4, NA <br /> W <br /> S 1 r C- <br /> .7 2- 0 .3 <br /> Pte' <br /> 11AX' <br /> - I I <br /> I <br /> I <br /> I I I i <br /> EWRONMENfAI-GEOTECHN� AND�� A 0EI CS <br />