Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION <br /> PROJECT NAME C1 2b9c:F ZDLF PROJECT NUMEER..�Q?SC:9 CCQS WELL NO WVJ - Z <br /> PROJECT MANAGER U TYPE OF WELL Monitonng Extraction Other <br /> RECORDED ey _- _ SAMPLED BY 7'd DATE <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Wed Cad'ing Diameter <br /> p�2-inch 4-inch Other <br /> der - Type , y <br /> Well Total Depth 7,& feet below Top of Casing,TO Pump - Type Ir6/U:bA <br /> Other - Specify <br /> Depth to Water [O r„�I 3 feet below Top of Casing,WL Hydrocarbon Odo <br /> Water Column Length °� feet Yes No <br /> Purge volume Calculation (Water Column Length x Multiplier x No dVolumes = Calculated Purge Volume) C <br /> / � X 0 LEY – 4 , 5z Calculated Purge Volume = b rJ� -gallons <br /> (WCL) (Multiplier) (No Volumes) Actual Purge Volume = _ Z i__ gallons <br /> Muttiolier (Casing Diameter Inches) = Gallons/linear foot 2=0 17 4=0 66 6=1 5 8=26 <br /> Groundwater Parameter Measurement- Meter Type TCaiibrated —Yes—No <br /> TIME ELAPSED FLCWRATE DTW pH EC T TURBIDITY REDOX COMMENTS <br /> TIME {GPh�j (ft) anhoslcmd (NTLD mV <br /> AskF O-e- <br /> foo <br /> 163 J.� /0,9 G-3 t� K <br /> I L2 !11 y o G <br /> Zj <br /> toy /D s 6 • <br /> DSO 67 <br /> �DS3 �(a Ilr S3 � 330 Z4 � <br /> • <br /> SKTH <br />