Laserfiche WebLink
GROUNDWATER-SAMPLING FORM <br /> PROJECT NAME. G �IrR P WELL NO: ' 2- <br /> M NAM <br /> PROJECT NUMBER, q 32 TYPE.✓Monitor!Extraction Other <br /> RECORDED BY: SAMPLED BY DATE. <br /> WELL PURGING <br /> PURGE VOLUME PURGE METHOD <br /> Well aa / <br /> rninp Deamtar _B&Aer-Type <br /> Y 2- ch 4-inch _other ✓P-mp-Typeyot-j_" <br /> Wag Total Depth rM ft below TOP 2-7$3 _Other-Specify <br /> Depth to Water IWL ft below TOCI 8 to Hydrocarbon Odors <br /> a ,YES _NO <br /> Water Column Length�q�1-1� <br /> No of Wells to be Purged ✓ 3 10 Other <br /> Purge Volume Calculation Dwaer corer.,Lid+:>rrArp6w=No.vele coed Puma vdw,rnel <br /> la. lq x Q7.% x 3 = Calculated Purge Volume = qIs <br /> r (WCL} (Multipl. (No. Vols) Actual Purge Volume = gls <br /> M[uldpsar lima Dia pncheal : Q.;AonaAlneat It] ZEo-TT 4: 0 66 6=f 5 6=2.6 v< <br /> Groundwater Parameter Measurement: Meter Type Calibrated /Yes No <br /> TIME/GALLONS DTW pH CONDUC TEMP TURBIDITY COMMENTS <br /> (ft) TivrTY de (NTU) (COLOR/ODOR) <br /> s�+o.ran ag F <br /> 64 <br /> 0� <br /> a <br /> [9 , °1 Co 5 5 Q (� t 5 <br /> q F G <br /> 09 I r 6o �v J� l �t Crf� <br /> r <br /> a <br />