Laserfiche WebLink
� AM <br /> • Working To Restore Nature <br /> on Figure 2 Field methodology and analytical results are discussed in detail in RESNA's <br /> Interim Problem Assessment Report, dated January 13, 1992. <br /> GROUNDWATER MONITORING AND SAMPLING <br /> RESNA personnel performed quarterly groundwater monitoring and sampling on December 27, <br /> 1993 Field work consisted of measuring the depth-to-water in wells MW 1 through MW6, <br /> purging and sampling the water from wells MW2, MW3 and MW4, and analyzing the samples <br /> for the presence of dissolved petroleum hydrocarbons <br /> The water table elevation has dropped an average of approximately 0 83 feet since the last <br /> monitoring event in July 1993 Groundwater monitoring data are summarized in Table 1 <br /> Groundwater beneath the site flows southwest with an overall gradient of 0 0009 ft/ft, or <br /> approximately 4 8 feet/mile A groundwater gradient map for the December 27, 1993 <br /> monitoring episode is shown on Figure 2 <br /> Groundwater samples were collected from wells MW2, MW3 and MW4 after purging and <br /> stabilization of physical parameters (pH, electrical conductivity, and temperature) The <br /> monitoring wells were purged and sampled according to RESNA's Quality Assurance/Quality <br /> Control Plan, on file with PHS/EHD Well purge logs are included in Attachment 1 <br /> LABORATORY ANALYSIS <br /> Collected groundwater samples were placed on ice and transported under chain-of-custody <br /> protocol to state certified Sequoia Analytical Laboratory Samples were analyzed for benzene, <br /> toluene, ethylbenzene, and xylenes (BTEX) and TPHg by EPA methods 8020 and modified <br /> 8015, respectively Laboratory analyses detected elevated concentrations of petroleum <br /> hydrocarbons in the samples collected from wells MW2, MW3, and MW4 Results are <br /> generally consistent with the historical levels Analytical results are summarized in Table 2 <br /> Laboratory reports and chain-of-custody documentation are presented in Attachment 2 <br /> The lateral extent of the dissolved contaminant plume associated with the former underground <br /> fuel storage tank has been essentially defined, except in the vicinity of well MW4, north of the <br /> former tank. It is unclear whether contamination at MW4 can be attributed to the former tank <br /> or from a potential off-site contributing source The next sampling round is scheduled for the <br /> first quarter of 1994 and the subsequent monitoring report submitted by April 30, 1994 <br /> As granted in PHS/EHD correspondence dated December 27, 1993, the sampling frequency of <br /> MW1 will be reduced to annually and wells MW5 and MW6 to semi-annually Wells MW2, <br /> MW3 and MW4 will continue to sampled quarterly This schedule is based upon historical <br /> groundwater analytical data. <br /> OW0309/ 2 <br /> Quart1y14QR-1993 FNL <br />