My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010829
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
26056
>
2900 - Site Mitigation Program
>
PR0545730
>
ARCHIVED REPORTS_XR0010829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2020 12:09:13 PM
Creation date
6/12/2020 12:00:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010829
RECORD_ID
PR0545730
PE
2957
FACILITY_ID
FA0005194
FACILITY_NAME
DONNA GARDNER
STREET_NUMBER
26056
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115046
CURRENT_STATUS
02
SITE_LOCATION
26056 THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VATC <br /> 1260 Graphics Drive <br /> Modesto California <br /> 95351 <br /> 209 579 2221 <br /> Fax 209 579 2225 <br /> ASSOCI(: <br /> ATES INC <br /> FIELD PROCEDURES <br /> Site Safety Plan <br /> This plan describes the safety requirements for field work performed at the site The site <br /> safety plan is applicable to personnel of ATC Associates Inc who perform the field work. A <br /> copy of the site safety plan is available for reference by appropriate parties during the work <br /> The on-site representative of ATC acts as the Site Safety Officer <br /> Groundwater Sampling <br /> The static water level in each well is measured to the nearest 0.01 foot with a Solinst electric <br /> water-level sounder cleaned with a laboratory-grade, non-phosphate detergent and deionized <br /> water before use in each well For wells with a history of contamination, a clean baler is used <br /> to obtain a sample from the surface of the water in the well for subjective analysis of <br /> hydrocarbons. The sample is retrieved and visually examined for floating product, sheen, <br />. color, and clarity <br /> Approximately 3 to 5 well volumes are purged from each well with a pre-washed submersible <br /> pump or bailer to allow sampling of representative formation water All down hole equipment <br /> is cleaned with a laboratory-grade non-phosphate detergent and water before use in each well <br /> The wells are purged until withdrawal of groundwater is of sufficient duration to result in <br /> stabilized pH, temperature, and electrical conductivity of the water, as measured by portable <br /> meters calibrated to a standard buffer and conductivity standard The wells are allowed to <br /> recover to approximately 80 percent of the static water level prior to sample collection The <br /> groundwater purged from the wells is temporarily stored in 55-gallon liquid waste drums <br /> approved for this use by the Department of Transportation (DOT) <br /> Hydrochloric acrd (or other appropriate chemical) Is added to the sample vials as a <br /> preservative. A sample of the formation water is then collected from the surface of the water <br /> in each of the wells with a clean disposable bailer and slowly transferred to laboratory-cleaned <br /> sample containers <br /> SHELLSIGWSAMPL.dQc <br />
The URL can be used to link to this page
Your browser does not support the video tag.