11 23 <br /> Ss <br /> 10.0 TIME LINE <br /> rw <br /> Following agency approval the estimated time necessary to <br /> complete the tasks proposed in this workplan is 10 weeks. <br /> Following agency approval, the distribution of tasks over <br /> this time period is shown below. Actual time may vary <br /> depending on drill rig availability, laboratory turn-around <br /> and unforeseen circumstances. <br /> i , <br /> ITEM W£EN------------------------------------------------------------------------------------ <br /> - <br /> 0 1 2 7 4 5 6 7 9 4 10 <br /> I , <br /> p.. <br /> Agancy Approval <br /> �' Hohilisation/Permits ++•' <br /> Soil Boring/ ••• <br /> Well Installation <br /> c.a Surveying <br /> fi Soil Analysis w•www•••+•••+ <br /> yu, ••• <br /> - - Well Development/ <br /> !•• Wafer Sampling <br /> Water Analyeic ••ww••w+••+• <br /> k <br /> Internal Revior/ ■••+..•+•►••+•+++» <br /> Report Preparation - <br /> 1 <br /> Report submittal <br /> to Agency <br /> r^ <br /> 4.0 REFERENCES <br /> i. Page, R. W., 1986, Geology of the Fresh Groundwater Basin of <br /> the Centrad Valley California with Restore maps and <br /> Section: U.S. Geological Survey Professional Paper, 1401- <br /> C, 54p. <br /> e.. <br /> 6 <br /> rim t% <br />