Laserfiche WebLink
a <br /> Product thickness is calculated by subtracting the depth to <br /> product from the depth to water- In addition, water <br /> elevations are adjusted for the presence of fuel with the <br /> following calculation: <br /> (Product Thickness) ( .B)+(Water Elevation) <br /> s Corrected Water Elevation <br /> 0.8 etroleum hydrocarbons the density difference <br /> Note: The factor of <br /> between water and p <br /> Newly installed wells will be allowed inspect onr 224hours after development prior to free product <br /> Sampler Will <br /> An acrylic Surface groundwater <br /> order to note sheens <br /> inspection of the g <br /> (difficult to detect with the interface Probe), odors, <br /> ents calibrated <br /> microb he action and and centimeters forvisual inspection of product <br /> in inc <br /> thickness. <br /> To reduce the potential for crus rs in contamination <br /> between fromthe <br /> wells, the monitorings will take place <br /> least to most contaminated, if known. Wells containing free <br /> Between each well <br /> product will be monitored <br /> be decontaminated. <br /> monitoring the equip <br /> Water level data collected from the wells a be <br /> si tea <br /> develop a groundwater contour map far the project <br /> Groundwater flow will be estimated to be perpendicular to <br /> equipotential lines drawn on the map. <br /> 10.0 Well t}evelopment Protocol <br /> Groundwater monitoring wells will be surged aely developed es <br /> prior to setting the surface seal. APP i withdrawn if <br /> the volume of water n the olumes will gbe calculated in the <br /> possible. casing v <br /> following manner: <br /> Volume of Schedule 40 PVC Pipe <br /> I.D. Volume <br /> Diameter <br /> {inches} (inches) Gal/linear ft. <br /> ------------------------------------------ <br /> 2 2.067 0.17 <br /> 4 4.026 0.66 <br />