My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012739
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
26056
>
2900 - Site Mitigation Program
>
PR0545730
>
ARCHIVED REPORTS_XR0012739
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2020 12:25:10 PM
Creation date
6/12/2020 12:02:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012739
RECORD_ID
PR0545730
PE
2957
FACILITY_ID
FA0005194
FACILITY_NAME
DONNA GARDNER
STREET_NUMBER
26056
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115046
CURRENT_STATUS
02
SITE_LOCATION
26056 THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will be worn to prevent cross <br /> sampling, latex gloves les. one pair of disposable <br /> contaminamion with other same collected. <br /> gloves will be dedicated to each sample will <br /> each end of the cylinder <br /> once the: sample is collected, or teflon tape and then capped <br /> taped, and labeled. The sample <br /> be sealed with aluminum foil a xiplock bag and <br /> with a polyethylene lid. sealed in ice or <br /> individuallice chest containing dry <br /> Will then be to a state certified <br /> i.mmed.'_F.tely placed in an delivery <br /> identification, storage and <br /> frozen chemica�ampiefor previous <br /> laboratory- <br /> transportation will be conducted as outlined in the <br /> section. <br /> 11,3 Sampling from Soil Piles or Shallow Soil Pits transported fzom <br /> will be collected and transp revious <br /> Soll samplesthe manner described d iutiliLed. if <br /> excavated material is backhoe will not r cylinders will <br /> ,ection, however, four bras. a <br /> les are ca 50eCcubic yards Of material to be <br /> composite samples the lead regulatory <br /> be collected for every Specified by the state <br /> sampled unle=s otherwise <br /> be composited by <br /> agency. The samplespersonnel prior to testing. <br /> certified analytical laboratory p <br /> 12.0 Groundwater Sampling protocol <br /> Prior to arriving at the sampling <br /> site, all sampling <br /> Y rade detergent, <br /> water, once with acetone, and once <br /> equipment will be washed with laboratory with carried out <br /> and rinsed twice with tap his procedure will be if more <br /> ling of other monitoring Wells, ling <br /> with deionized water. the same sampling <br /> on-site before a p i be sampled with <br /> than one well <br /> device. DTW) in <br /> ling, the depth to w product on top <br /> Immediately prior to ampling, <br /> thickness of p <br /> will be measured sssing an <br /> r the well will be recorded•resent, resented <br /> groundwater if P is p <br /> of the 9 procedure for n1°Protocol)- <br /> in <br /> probe. The p <br /> in Section 9.0 Groundwater. Monitoring <br /> analysis of groundwater at the <br /> A <br /> If free product is detected, <br /> etect aoduct will not be conducted. <br /> interface for dissolved P an interval specific <br /> Product sample will be collected for source identification <br /> be utilized to collect a sample from <br /> Pf all free product cannot be removed, at least <br /> sampling device may product. Before collecting <br /> below the <br /> zone of free p from each well, the w�anductivitY <br /> two groundwater samples parameters (temperature, <br /> purged until indicator p The <br /> and pH) stabilize. This will entail bailing eore pumping.at leas <br /> volumes by volumes and temporary <br /> four well casing well casing hell <br /> criteria for determining parameter measurements <br /> storage of purged water is outlined in Section 10su <br /> Development Protocol). <br /> The indicator p of each well <br /> will be taken both before and after purging <br />
The URL can be used to link to this page
Your browser does not support the video tag.