My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012739
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
26056
>
2900 - Site Mitigation Program
>
PR0545730
>
ARCHIVED REPORTS_XR0012739
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2020 12:25:10 PM
Creation date
6/12/2020 12:02:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012739
RECORD_ID
PR0545730
PE
2957
FACILITY_ID
FA0005194
FACILITY_NAME
DONNA GARDNER
STREET_NUMBER
26056
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115046
CURRENT_STATUS
02
SITE_LOCATION
26056 THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will be worn to prevent cross <br /> sampling, latex gloves <br /> samples. One Pair o£ disposable <br /> contamination with other <br /> gloves will. be dedicated to each sample collected. <br /> le is collected, each end of the cylinder will <br /> Once the same a and then capped <br /> be sealed with aluminum foil or teflon tape The sample <br /> with a Polyethylene lid, aled in a ziplock bag and <br /> will then bei i uan lice echest coataining dry ice or <br /> immediately placedte certifJed <br /> frozen chemicaSice for delivery to a sta <br /> Sample identification, storage <br /> laboratory. <br /> transportation will be conducted as outlined in the previous <br /> section. <br /> 11.3 Sampling from Soil Piles or Shallow Soil Pits <br /> Sail samples will be collected and transported from <br /> in the manner described in the previous <br /> be utilized. if <br /> excavated material cylinders will <br /> section, however, a backhoe will not <br /> composite samples are collected, four brass cy <br /> be collected for every 50 cubic yards of material to be <br /> sampled unless otherwise specified by the lead omposited by theulatate <br /> samples will be ersonnel pr <br /> ar to testing. <br /> agency. The <br /> certified analytical laboratory P <br /> 12.0 Groundwater Sampling Protocol <br /> site, all sampling <br /> Prior to arriving at the sampling ory rade detergent, <br /> equipment will be v-ashed with <br /> ,laobnceawi h acetone, and once <br /> and rinsed twice with tap his procedure will he carried out <br /> with deionized water_ of other monitoring wells, if more <br /> on-site before sampling <br /> s P tongbe sampled with the same sampling <br /> than one well <br /> � device. DTW) in <br /> the depth to water <br /> immediately prior to sampling, product on top <br /> the well will be recorded. The thickness of using an <br /> of the groundwater, if present, will be measu is presented <br /> interface probe. The procedure for monitoring <br /> of col) . <br /> in Section 9.0 (Groundwater Monitoring <br /> If free product is detected, analysis of groundwater at the <br /> interface for dissolved product will not be <br /> conducted. A <br /> t <br /> identification, <br /> product sample will be collected for soancinterval specific <br /> If all free product cannot be rem to collect a sample from <br /> sampling device may be utilized to <br /> below the zone of free product- Before COthec well <br /> will least <br /> two groundwater samples from each well, conductivity <br /> purged until indicator parameters (temp <br /> and pH) stabilize. This will entail the ore pum pumping. le The <br /> four well casing volumes by bail g volumes and temporary <br /> Well <br /> criteria for determining well casing ammeter measurements <br /> storage of purged water is outlined in Stiction 10.0• <br /> Development Protocol) . The indicator p of each well <br /> will be taken both before and after purging <br />
The URL can be used to link to this page
Your browser does not support the video tag.