Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations <br />that have not been addressed for ESCALON UNIFIED SCHOOL DIST as of July 02, <br />2020. <br />Open violations from JU 16, 2018 inspection <br />Violation #203 -Failure to implement the SPCC Plan. <br />The SPCC plan states that Appendix E of the plan will be posted next to loading areas. Appendix E, <br />describing unloading/loading procedures was not seen posted near the loading/unloading areas. The SPCC <br />plan calls for spill kits to be placed near the dispensers, spill kits were not observed near the dispensers. The <br />owner or operator or an onshore or offshore facility subject to this section must prepare in writing and <br />implement a Spill Prevention Control and Countermeasure Plan (hereafter "SPCC Plan" or "Plan")," in <br />accordance with § 1127 and any other applicable section of this part. Implement the SPCC plan as written <br />or amend the plan to reflect actual facility procedures. <br />This violation was corrected <br />❑ Supporting documents included <br />❑ This violation will be corrected by (date) <br />Describe actions taken or will be taken to correct violatio <br />C.A <br />�►vD tn/lc.� ¢�= Pc.�9csD ^/t;"►�iz 'tNt �IsF���;zs, <br />G <br />Violation #301- Failed to amend Plan as necessary. <br />The 500 gallon used oil aboveground storage tank described as being in the diked area next to the 10,000 <br />gallon diesel tank is no longer at the site and a square blue used oil tank outside of the diked area, near the <br />oil water separator is not mentioned in the SPCC plan. The Spill Prevention, Control, and Countermeasure <br />(SPCC) Plan must be amended when there is a change in the facility design, construction, operation, or <br />maintenance that materially affects its potential for a discharge, within 6 months of the change, and <br />implemented as soon as possible, not later than 6 months following preparation of the amendment. <br />Immediately make all necessary amendments to the SPCC Plan to accurately represent the procedures and <br />policies currently in place at the facility. <br />❑ This violation was corrected M <br />This violation will be corrected by (date) <br />❑ Supporting documents included <br />Describe actions taken or will be taken to correct violation Wo RX(/J& VJ i'rN 6NER- <br />T-a D PL►RN toi��2oPc+�Ly r"�r✓ru��s€/v'T ave Wn2��T <br />►4c -i a ry sTA-:ru S <br />Violation #302 -Failed to review Plan once every five years and/or implement any resulting <br />amendments. <br />The Spill Prevention, Control, and Countermeasure (SPCC) Plan was last reviewed on April 9, 2011. A <br />review and evaluation of the SPCC Plan must be conducted at least once every 5 years. As a result of this <br />review and evaluation, the SPCC Plan must be amended within 6 months of review, and recertified by a <br />Professional Engineer if any technical amendments were made. Immediately conduct a review of the facility <br />SPCC Plan and make any necessary amendments. <br />Page 1 of 6 <br />