My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1176
>
2800 - Aboveground Petroleum Storage Program
>
PR0528253
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 3:30:11 PM
Creation date
6/12/2020 3:31:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0528253
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0003822
FACILITY_NAME
ESCALON UNIFIED SCHOOL DIST
STREET_NUMBER
1176
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22705007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1176 STANISLAUS ST ESCALON 95320
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations <br />that have not been addressed for ESCALON UNIFIED SCHOOL DIST as of July 02, <br />2020. <br />Open violations from July 16, 2018 inspection <br />Violation #612 -Plan failed to include secondary containment, diversionary structures, or equip to <br />prevent discharge. <br />The SPCC plan failed to discuss secondary containment for all tanks besides the 10,000 gallon diesel and <br />the used oil tank that was within the diked area. The 1,000 gasoline tank was partially addressed with the oil <br />water separator but portions of the tank are over soil that does not slope towards the oil water separator. <br />Secondary containment for petroleum containers over 55 gallons in the shop were not addressed in the <br />SPCC plan. The secondary containment for the new waste oil tank and the 55 gallon drums of used oil <br />outside of the diked area was not addressed in the SPCC plan. A facility shall provide appropriate <br />containment and/or diversionary structures or equipment to prevent a discharge. The entire containment <br />system, including walls and floor, must be capable of containing oil and must be constructed so that any <br />discharge from a primary containment system will not escape the containment system before cleanup occurs. <br />Immediately provide adequate secondary containment for all aboveground petroleum storage containers <br />larger than 55 gallons. <br />This violation was corrected ❑This violation will be corrected by (date) <br />❑ Supporting documents included <br />Describe actions taken or will be taken to correct violation 1,00o GAti LL -QA) T/94 -A; K 1400 0 61E� MCA) <br />A,Tn r) ,v AgeA vNi)Etz w;rH Cue1? #7b Qi16z%T uf TD' viLlvVWTZ!T1 <br />0AWMAW 751 <br />Violation #613 -Failure to provide appropriate secondary containment, diversionary structures or <br />equipment. <br />The diked area holding the 10,000 gallon diesel tank appears to have potential escape routes for the diesel <br />in the event of a release from the primary tank. The seals for the underground pipes appear to be damaged, <br />allowing for liquid to flow into the piped area. A broken cap for an unknown purpose was also observed in the <br />diked area allowing for the possible escape of diesel in the event of a release from the primary containment . <br />A facility shall provide appropriate containment and/or diversionary structures or equipment to prevent a <br />discharge. The entire containment system, including walls and floor, must be capable of containing oil and <br />must be constructed so that any discharge from a primary containment system will not escape the <br />containment system before cleanup occurs. Immediately provide adequate secondary containment for all <br />aboveground petroleum storage containers larger than 55 gallons. <br />.MI This violation was corrected El This <br />violation will be corrected by (date) <br />❑ Supporting documents included <br />Describe actions taken or will be taken to correct violation 5E �-5 �� P•'�t i2 -ED �u b WV9-Ct S <br />l � CANT �/Nih T /`1 hcR S fFLEn �1y D Lau JL GUN"I—fFllJM" 9= Foil <br />OTH R AKcuE&R&c )ND cST Z6&F_ CUNTi4IMCE5 H►YS 3CEA1 02Dci � <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.