My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VAL DERVIN
>
107
>
2200 - Hazardous Waste Program
>
PR0505919
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2020 6:43:15 PM
Creation date
6/12/2020 5:27:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0505919
PE
2220
FACILITY_ID
FA0007083
FACILITY_NAME
B & C PAINTING SOLUTIONS INC
STREET_NUMBER
107
STREET_NAME
VAL DERVIN
STREET_TYPE
PKWY
City
STOCKTON
Zip
95206
APN
19337005
CURRENT_STATUS
01
SITE_LOCATION
107 VAL DERVIN PKWY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ow <br /> 94565-1701 <br /> ^?_ McCampbell Analytical, Inc. 1534WdIphone: 877)25Pittsburg,CA <br /> (925)252-9 <br /> Toll Free Telephone:(877)252-9262/Fax:(925)252-9269 - <br /> `� rr n http://www.mccampbell.com/E-mail:main n ccampbell.com <br /> When Quality Counts - <br /> WORK ORDER SUMMARY <br /> Client Name: FREMOUW ENVIRONMENTAL SERVICES,INC. Project: 81993;B&C Painting Solutions Work Order: 1904315 <br /> Client Contact: Dina Barron QC Level: LEVEL 2 <br /> Contact's Email: dbarron@hazwasteremoval.com; Comments Date Logged: 4/5/2019 <br /> prapozo @hazwasteremoval.com; <br /> F-1WaterTrax [:]WriteOn E]EDF Excel E:]EQulS Email E]HardCopy E]ThirdParty E]J-flag <br /> Lab ID Client ID Matrix Test Name Containers Bottle&Preservative De- Collection Date TAT Sediment Hold SubOut <br /> /Composites chlorinated &Time Content <br /> 1904315-OOIA Powder Paint-1 Soil SW6020(CAM 17) 1 Stainless Steel tube 2"x6" ❑ 4/4/2019 11:15 5 days F7 <br /> NOTES: -STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results <br /> in 3 days from sample submission). <br /> -MAI assumes that all material present in the provided sampling container is considered part of the sample-MAI does not exclude any material <br /> from the sample prior to sample preparation unless requested in writing by the client. <br /> Page 1 of 1 <br /> Page 8 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.